如何维护及加固户外广告招牌?

发布时间:2020-09-04 16:45:47  来源:https://www.hongchenad.com/  

  户外广告招牌地基加固的方法
  Foundation reinforcement method of outdoor advertisement signboard
  (1)基础扩大法:通过设置混凝土围套或钢筋混凝土围套,增加广告牌底部基础的面积,改变因广告牌基础底面积偏小、承载力不足而产生的地基不均匀沉降。
  (1) Foundation expansion method: by setting concrete or reinforced concrete sheaths, the area of the foundation at the bottom of the billboard is increased, and the uneven settlement of the foundation caused by the small area and insufficient bearing capacity of the billboard foundation is changed.
  (2)坑式托换法:直接在被托换基础下挖坑后浇筑混凝土。
  (2) Pit underpinning method: concrete is poured directly after digging the pit under the underpinned foundation.
  (3)桩式托换法:采用在广告牌基础的下部或两侧设置静压柱、打入桩、灌注桩等各类桩来进行基础加固的方法。
  (3) Pile underpinning method: static pressure column, driven pile and cast-in-place pile are set at the bottom or both sides of the billboard foundation to reinforce the foundation.
              济南广告制作公司
  (4)灌浆托换法:将化学浆液均匀地注入地基中,通过这些浆液把原来松散的土质或裂缝胶结固化,以达到提高地基承载力,防水抗渗的作用。
  (4) Grouting underpinning method: the chemical slurry is evenly injected into the foundation, and the original loose soil or cracks are cemented and solidified by these slurry, so as to improve the bearing capacity of the foundation, waterproof and impermeable.
  纠偏就是采用人为的手段使已倾斜的地基进行反向倾斜的操作,以达到矫正户外广告牌倾斜的目的。
  Rectifying deviation is to use artificial means to make the tilted foundation reverse tilt operation, so as to achieve the purpose of rectifying the inclination of outdoor billboards.
  常用的户外广告牌地基纠偏的方法有以下几种:(1)迫降纠偏法:在户外广告牌基础沉降多的一侧面采取阻止下沉的措施,而在另一侧采取迫降措施。迫降方法包括:加载钢锭或石块、修建悬臂梁、掏土迫降、注水纠偏等。(2)顶升纠偏法:在倾斜广告牌基础沉降大的部位,通过调整广告牌各部分的顶升量,使其沿某一点或某一直线作整体平面转动,以达到恢复原位的目的
  The commonly used foundation rectification methods of outdoor billboard are as follows: (1) forced landing correction method: take measures to prevent subsidence on one side of outdoor billboard foundation settlement, and take forced landing measures on the other side. The methods of forced landing include loading steel ingot or stone, building cantilever beam, digging soil and rectifying deviation by water injection. (2) Lifting rectification method: in the part with large foundation settlement of inclined billboard, adjust the jacking amount of each part of the billboard to make it rotate along a certain point or a straight line to achieve the purpose of restoring the original position